Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | POTENTIAL / POTENCY |
Model Number : | KGZ9300 |
Certification : | ISO9001:2015 |
Price : | Negotiable |
Payment Terms : | T/T, L/C |
Supply Ability : | 120 Units Per Year |
Delivery Time : | 45 Working Days |
KGZ9300 Revolutionize Your Construction Process with Arch Installation Trolley The Ultimate Tool for Arch Installation
Given that mechanization of arch installation has become a trend in
the current tunnel construction process, and there are products on
the market that cannot be used or only achieve mechanization
without improving work efficiency and significantly reducing
construction personnel, they do not have true practical value.
Potential/Potency has developed this product by combining the advantages of the
company's already produced multi arch support manipulator and
multifunctional rock drilling machine. It can not only meet the
requirements of improving work efficiency and reducing personnel,
but also meet the ability of the entire process of tunnel arch
erection operation. This product has currently applied for multiple
invention patents.
Item | Parameter | Value | Unit |
1 | Maximum Load of The Main Arm | 3000 | kg |
2 | Scope of Application of Steel Arches | Ⅰ12~Ⅰ25a | / |
3 | Rock Drill Power | 13 | KW |
4 | Drilling Diameter of Rock Drill | Φ33~Φ64 | mm |
5 | Drilling Depth of Rock Drill (Single Rod) | 4.5 | m |
6 | Drilling Speed of Rock Drill | 1-1.5 | m/min |
7 | The Walking Speed | Low Speed Gear:0~8 | km/h |
8 | Minimum Turning Radius | Inner≤3m;Outer≤6m | m |
9 | Gradeability | 22 | ° |
10 | Maximum Load of Aerial Work Platform | 400 | kg |
11 |
| 13 | m |
12 | Maximum Working Width | 15 | m |
13 | Dimensions in Transport State (Length x Width x Height) | 99200×2800(3526)×3650 | mm |
14 | Weight | 35000 | kg |
Steel frame installation: The arch frame installation trolley is
used for the installation of steel frames inside the tunnel. The
steel frame is the skeleton of the tunnel structure, supporting the
stability and safety of the tunnel. By using the installation
trolley, the steel frame can be accurately positioned and quickly
installed, improving work efficiency and installation accuracy.
Mesh installation: In addition to the steel frame, the arch
installation trolley is also used to install mesh. Mesh is a part
of tunnel lining used to disperse and absorb geostress, prevent
rock loosening and collapse. The installation trolley can carry and
fix the mesh, allowing it to be quickly and accurately installed in
place.
Installation of connecting bars: Connecting bars are important
connecting components between steel frames and mesh sheets,
ensuring the integrity and stability of the entire supporting
structure. The arch installation trolley can assist in the
installation of connecting bars, ensuring that each connection
point is firm and reliable.
Auxiliary inspection and risk mitigation: Safety inspection and
risk mitigation are crucial during tunnel construction. The arch
installation trolley is equipped with relevant equipment and tools,
which can assist construction personnel in conducting safety
inspections and risk mitigation work, timely discovering and
handling potential hazards, and ensuring construction safety.
Underexcavation handling: Underexcavation may occur during tunnel
excavation. The arch installation trolley can assist construction
personnel in handling under excavation, ensuring that the
cross-sectional dimensions of the tunnel meet the design
requirements.
Explosive installation: The installation of explosives is a
critical step in tunnel construction during blasting operations.
The arch installation trolley is equipped with safety protection
devices and operating platforms, which can assist construction
personnel in safely and accurately installing explosives, ensuring
the safety and effectiveness of blasting operations.
Anchor rod installation: Anchor rods are an important component of
tunnel support, used to fix surrounding rock and prevent collapse.
The arch installation trolley can carry anchor rods and
installation equipment to assist construction personnel in
installing anchor rods, improving construction efficiency and
safety.
![]() |